Investment Projects

Sale of iron ore deposits — Taldysay

  • Indicator Results
  • Investment amount, thousand US dollars
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

GENERAL OVERVIEW:

  • Project: Taldysay Iron Ore Deposit and Associated Components
  • License No. 1328-EL, issued on 15 June 2021, valid for 6 years
  • Licensed Area: 5 blocks, covering 10 sq. km
  • Location: Karaganda Region, Nura District, 273 km from Karaganda, 229 km from Astana, in close proximity to the Shubarkol coal deposit

GEOLOGY AND MINERALIZATION:

  • Discovered in 1965
  • Deposit type: volcanogenic-sedimentary
  • Main minerals: hematite (Fe up to 62%), manganese, lead, germanium, sulfur, phosphorus
  • Estimated reserves (author’s estimate): 48 million tonnes, with an average Fe content of 51.14%

INFRASTRUCTURE:

  • Proximity to Shubarkol railway station (78 km)
  • Access to road infrastructure (8 km to the Barshino – Shubarkol graded road)

GEOPHYSICAL DATA:

  • High-precision magnetic survey conducted by Aurora AG Limited
  • 3D inversion model of magnetic susceptibility constructed
  • Promising anomalous targets identified: length up to 1,200 m, width approximately 200 m, depth up to 350 m

PROSPECTS AND RECOMMENDATIONS:

  1. Recommended drilling to a depth of up to 300 m on identified anomalies
  2. Potential expansion of the licensed area by 5 additional blocks (Zarechnoye mineral occurrence)
  3. Positive market conditions: current market price for Fe (62% CFR) is approximately USD 106 per tonne

PILOT-INDUSTRIAL MINING:

  • Permit granted for the extraction of up to 4 million tonnes of iron-bearing ore

+7776 055 0999 +7747 453 92 53

nazhapov.khannar@icloud.com

Global consumption
of iron ore (in million tons),
2021–2035


Return back
Install the application:
1) Open the website in Safari
2) Click save
3) Add to home screen